'The Assembly' Leamington Spa

This prestigious project commenced for ourselves in January 2008, this is what we encountered on our first visit:-

We provided all of the drapery for curtains to back of stage x 6m drop. Above stage , either side of the stage and over exit doors at rear of hall, all shaped as can be seen

Also at high level x 11m wide with remote operated electric tracks. At entrance to VIP area, in bar area and a suspended canvas canopy above the control desk

Home - About Us - Collection / Delivery - Terms & Conditions - Links - Contact Us - Sitemap
© Fabric Mills Ltd 2007 - 2010 - Web Site Design by I-Pixel